HOME
Architrecture at the Edge 2017
LINKS
SARSFIELD BRIDGE RESTORARION
HISTORY
SUSTAINABILITY
More
To enable work the river had to be diverted around the bridge.
A dam and a diversion channel were built.
On Oct 17th 2012 the river level rose perilously. The dam held!